• Hi Guest, want to participate in the discussions, keep track of read/unread posts and more? Create your free account and increase the benefits of your WyoNation.com experience today!

HAPC video....

McMurry High Altitude Performance Center Flythrough (Wyo-Vision)

Groundbreaking: 10/29/16

[youtube]https://www.youtube.com/watch?v=MLqjkYGiPTE[/youtube]
 
That's pretty sweet, but I gotta say I wish they could keep the big trees behind the stadium, and the arch...although I've heard they are changing the design and building around the arch, not sure if that's true
 
The video shows something I was worried was going to be taken away....Steamboat. I thought the building was going to start a lot closer to the field. Good to see Steamboat is staying there.
 
joshvanklomp said:
The video shows something I was worried was going to be taken away....Steamboat. I thought the building was going to start a lot closer to the field. Good to see Steamboat is staying there.
That was one of my two concerns.......good to see


The second, however, is where are we putting the French 75 (currently French 37 1/2)..........:dead: I'm still waiting for our cannon to fire @ 100℅

Sent from my XT1585 using Tapatalk
 
joshvanklomp said:
The video shows something I was worried was going to be taken away....Steamboat. I thought the building was going to start a lot closer to the field. Good to see Steamboat is staying there.
I heard it's only 50 ft away from the field.
 
Back
Top